Tau.Neutrino said:


Michael V said:

Tau.Neutrino said:

They could design a better solution with in inner layer then the whole lot can be pulled out.

Consider how the spiral mixing/reworking/lifting blades work.

Ok, now I’ve considered it, an inner layer will not work.

I don’t think it happens a lot, as the operators would make a great effort to avoid it. It’d have to be expensive to replace the big mixer.
If they were desperate to keep on using one I guess they could make it in two main pieces that bolt together around the maximum dimension point. It’d be easier to get the leftover concrete out that way.