Divine Angel said:

Spiny Norman said:

SCIENCE said:

roughbarked said:

SCIENCE said:

oh what’s this

Over 315 proposed data centre developments are now queuing for an electricity grid connection in Britain. If they all hooked up to the grid, Britain would need to nearly double the power it generates to meet their needs. That’s according to energy regulator Ofgem, which is proposing an upfront fee of up to £712,500 for each MW sought by prospective data centre operators, in a bid to filter out “speculative” applications for connections. The proposal from Ofgem comes as grid connection applications tripled in under a year to June 2025 to 125GW. Data centre projects account for “at least 80GWs,” of that, said Ofgem in a July 29 press release. (That 80GWs figure is a mistake, a spokesperson subsequently told The Stack, after we clarified some inconsistencies in the figures provided, saying “73GW is the best estimate we have from NESO as the system operator.”) Regardless, the figure is striking: Peak electricity demand in 2025/26 was an estimated 45GW – and the data centre development pipeline represents £693 billion of implied total CapEx, said Ofgem; equivalent to a quarter of UK GDP.

LOL

https://www.thestack.technology/as-300-data-centres-jostle-for-new-grid-connections-the-uks-energy-regulator-calls-bullsh-t/

WTF


LOL obviously king is better than queen, and their data centres can use ten quarters of their power

Australia’s largest proposed data centre could draw a quarter of Queensland’s energy use

In short:
A proposed data centre at a feedlot in Queensland would have a total peak capacity of 2.16 gigawatts, equivalent to 1.5 million average Australian households.

The Western Downs Regional Council is considering the development application for the project, currently the largest proposed data centre in Australia.

What’s next?
Experts say new energy generation assets need to be introduced as soon as possible to power the artificial intelligence boom.

https://www.abc.net.au/news/2026-09-14/western-downs-digital-park-data-centre-energy-queensland/107115082

AI is bleeding money. These data centres swallow resources from the rest of us plebs. Never mind, I’m sure it’s a great idea on paper.

so you reckon the correct interpretation is that they’re just making an excuse for when their progress naturally grinds to a halt and their great big water bomb balloon ruptures